A whole-property refurbishment brings many trades through the same rooms. We price each part of the work as its own line, plan the trades against calendar weeks, and run the job as one programme, from the roof to the skirting boards.

75 m² flat, standard finish, inc. contingency and VAT

£82,000 to £130,000

House and flat refurbishment in London: at a glance

Typical cost
£82,000 to £130,000
75 m² flat, standard finish, inc. VAT
Example programme
16 weeks
House refurbishment with new roof, 2025
Contingency
10%
Shown as its own line
Leasehold flats
Freeholder consent
Check the lease early

Scope

What a full refurbishment can include

Taken from our recent house refurbishment schedules. Your schedule lists only what your property needs.

Sectional line drawing of a two-storey Victorian terraced house showing every room, floor and the roof
A whole-house refurbishment touches every floor, from roof to ground. Illustration

Building work

  • Strip-out, and removal of ceilings, partitions and old finishes
  • New stud partitions with sound insulation
  • Structural carpentry and steel where layouts change
  • Roof renewal, such as natural slate with breathable membrane and wood fibre insulation
  • Windows, external doors and rooflights
  • Drylining, plastering and repairs to cornices and skirtings
  • Electrics, heating and plumbing
  • Bathrooms, kitchen and joinery
  • Staircase restoration
  • Flooring, tiling and decoration

Priced as options

  • Built-in wardrobes and headboard joinery
  • Understairs storage
  • Reclaimed floorboards to match existing
  • Garden paving and boundary wall repairs

Refurbishment projects

Recent refurbishments

All projects

One programme

Many trades, the same rooms, one plan.

Each part of a whole-house refurbishment is priced as its own line and planned against calendar weeks, so every trade knows when the rooms are theirs.

Studio photograph

Costs

What a refurbishment costs in London

For a 75 m² flat at a standard finish, without moving walls, the planner gives £82,000 to £130,000 including contingency and VAT. At an upgraded finish it comes to £125,000 to £198,000.

What is behind the walls
Old wiring, lead or iron pipes, and damp all add work that cannot be seen until strip-out. We show these as provisional sums until they are known.
The roof and windows
Renewing a roof or replacing windows adds scaffolding and specialist trades, and are often the largest single lines.
Layout changes
Moving walls adds a structural engineer, Building Control and more making good.
Options
Joinery and other upgrades are priced separately so you can add them without re-pricing the whole job.

The total internal area is on your estate agent's floor plan. 10 sq ft is about 0.93 m².

Estimated total including VAT

£82,000 to £130,000

£68,000 to £108,000 before VAT

Standard finish. Choose your finish level and extras in the full planner.

See the line-by-line breakdown

Rules

Consents and regulations for refurbishments

Leasehold flats
Most leases need the freeholder’s written consent before alterations. Check the lease early, as consent can take weeks.
Building Control
Needed for structural changes, new drainage, replacement windows and roofs, and electrical work not certified by a registered electrician.
Roofs and insulation
Replacing a large part of a roof usually means bringing its insulation up to current standards.
Conservation areas and listed buildings
Changes to windows, doors and roofs may need planning permission, and any works to a listed building need listed building consent.

Programme

A real programme from one of our refurbishments

Issued before work started. Stages overlap where trades can work alongside each other.

A 16-week programme from one of our house refurbishments
Stage 12345678910111213141516
Site set-up Week 1
Demolition and strip-out Week 2 Week 3
Structural works Week 4 Week 5
Upper floors Week 4
External walls Week 6
Internal walls Week 7
Roof Week 8 Week 9
Electrics and lighting Week 9 Week 10
Windows and doors Week 10
Mechanical installations Week 10 Week 11
Drylining and plastering Week 11 Week 12
Plumbing and sanitaryware Week 12 Week 15
Finishes and decoration Week 12 Week 13 Week 14
Joinery and second fix Week 15 Week 16
External works and handover Week 16
House refurbishment with a new slate roof, rooflights, windows, doors and joinery. Programme issued before work started, 2025.

Reviews

What homeowners wrote

Unedited, from our Trustpilot page.

  • Really professional service, we have ordered bespoke joinery units for my parents house, made with spray painted MDF with routed handles and also soft close drawers internally for the wardrobes. We also ordered a bespoke tv unit. Really great work, we loved it!

    ★★★★★ Elen Z. Bespoke wardrobes and TV unit Trustpilot, September 2024
  • Very professional company and great communication. Job complete in time. Highly recommended.

    ★★★★★ Alenoush G. Trustpilot, October 2024
  • Mount St Projects did a fantastic job with our property! We love our new doors and are so impressed with their service and communication. Highly Recommended!

    ★★★★★ Arman New doors Trustpilot, September 2024

Questions

Questions about refurbishments

How much does it cost to refurbish a flat in London?

From our planner: a 50 m² one-bedroom flat at a standard finish comes to £54,000 to £87,000, and a 75 m² two-bedroom flat to £82,000 to £130,000, including contingency and VAT.

How much does a full house renovation cost in London?

A 120 m² house at an upgraded finish, with some walls moved, comes to £204,000 to £323,000 including contingency, fees for the structural changes and VAT. Roofs, windows and extensions are usually priced on top.

How long does a house refurbishment take?

It depends on scope. One recent house refurbishment, including a new slate roof, rooflights, windows and joinery, was programmed at 16 weeks on site.

Can we live in the property during the work?

Sometimes, with phasing. A full refurbishment with services renewed is usually simpler with the property empty.

Sources and method

Scope lines and the 16-week programme come from our own house refurbishment schedules from 2025.

  1. GOV.UK: conservation of fuel and power (Approved Document L)
  2. Historic England: listed building consent

Next step

What happens when you get in touch

  1. Tell us about the project

    Two minutes on our enquiry form, or call us. Drawings help but are not needed.

  2. We visit and measure

    We look at the property, the access, and anything that affects price: structure, services, neighbours, the landlord’s requirements.

  3. You receive a priced schedule of works

    Every line itemised, with provisional sums and exclusions stated, so you can compare it line by line with any other quote.