One bathroom, standard finish, supplied and fitted, inc. VAT
£12,000 to £17,000
- Federation of Master Builders member
- Itemised schedules of works
- Reviews on Trustpilot
Bathroom renovation in London: at a glance
- Typical cost
- £12,000 to £17,000
- One bathroom, supplied and fitted, inc. VAT
- Build-up
- Stripped back and waterproofed
- Plywood sub-floor, moisture-resistant boards
- Electrics
- Special location
- Certified by a registered electrician
- Flats
- Freeholder consent
- Usually needed before work starts
How we build a bathroom
What happens behind the tiles
These steps come from the works plan for a recent Ealing house with two bathrooms.
Included
- Strip-out of sanitaryware, tiles and wall coverings back to plaster or brick
- Old floorboards lifted and replaced with an 18 mm plywood sub-floor
- Moisture-resistant plasterboard and new plaster
- Waterproofing to floors and to walls in wet areas
- All pipework concealed
- Toilet, basin, bath or shower installed
- Heated towel rail, extractor fan and recessed lighting
- Floor and wall tiling, then decoration
You can supply
- Tiles, sanitaryware, brassware and mirrors. We price labour only for items you buy directly.
- Paint, if you have chosen your own.
Bathroom projects
Recent bathrooms
Behind the tiles
The part you never see is the part that lasts.
Walls stripped back to plaster or brick, moisture-resistant board, a plywood sub-floor, waterproofed wet areas and concealed pipework, all before the first tile goes on.
Studio photograph
Costs
What a bathroom renovation costs in London
One bathroom, supplied and fitted at a standard finish, comes to £12,000 to £17,000 including contingency and VAT. An upgraded finish with natural stone or large-format tiles comes to £16,000 to £26,000.
- Moving things
- Keeping the toilet near the soil stack keeps cost down. Moving it, or adding a bathroom where there was none, adds new waste runs and sometimes a pump.
- Tiles and stone
- Large-format porcelain and natural stone need flatter walls and more time to lay than standard tiles.
- Showers
- Walk-in and level-access showers need the floor built up or dropped, and more waterproofing.
Estimated total including VAT
£12,000 to £17,000
£10,000 to £14,000 before VAT
Standard finish. Choose your finish level and extras in the full planner.
See the line-by-line breakdownRules
What the regulations require in a bathroom
- Electrics
- Bathrooms are special locations for electrical work. New circuits must be installed and certified by a registered electrician, or inspected by Building Control.
- Ventilation
- The Building Regulations require extract ventilation in bathrooms, usually an extractor fan.
- Flats
- Leases often need the freeholder’s consent for bathroom works, especially where waste pipes or floors change. Waterproofing matters more when there is a flat below.
-
Really professional service, we have ordered bespoke joinery units for my parents house, made with spray painted MDF with routed handles and also soft close drawers internally for the wardrobes. We also ordered a bespoke tv unit. Really great work, we loved it!
★★★★★ Bespoke wardrobes and TV unit Trustpilot, September 2024 -
Very professional company and great communication. Job complete in time. Highly recommended.
★★★★★ Trustpilot, October 2024 -
Mount St Projects did a fantastic job with our property! We love our new doors and are so impressed with their service and communication. Highly Recommended!
★★★★★ New doors Trustpilot, September 2024
Questions
Questions about bathroom renovations
How much does a bathroom renovation cost in London?
From our planner: one bathroom at a standard finish comes to £12,000 to £17,000, at an architect-specified finish to £25,000 to £42,000, and two standard bathrooms to £23,000 to £33,000, all supplied and fitted with contingency and VAT.
Do you tank or waterproof bathrooms?
Yes. Wet areas are waterproofed on walls and floors before tiling, on top of moisture-resistant boards and a plywood sub-floor.
Can I supply my own tiles and sanitaryware?
Yes. We price installation only for anything you buy directly.
Do I need Building Control for a new bathroom?
For a like-for-like replacement, usually not. New drainage connections, structural changes and electrical work not certified by a registered electrician need Building Control.
Sources and method
Build-up steps are taken from our works plan for a 2025 house refurbishment in Ealing.
-
Tell us about the project
Two minutes on our enquiry form, or call us. Drawings help but are not needed.
-
We visit and measure
We look at the property, the access, and anything that affects price: structure, services, neighbours, the landlord’s requirements.
-
You receive a priced schedule of works
Every line itemised, with provisional sums and exclusions stated, so you can compare it line by line with any other quote.